Case Studies & Project Showcase

CASE STUDY 1: AEROSPACE COMPONENT OPTIMIZATION

Client: Leading Aerospace Systems Manufacturer
Challenge: Production bottleneck in precision component manufacturing causing 12-week delivery delays and 18% material waste

Solution: AOA implemented advanced CAD optimization and lean manufacturing redesign

  • Streamlined production workflow
  • Reduced material waste by 28%
  • Automated quality checkpoints
  • Supply chain optimization

Results:
✓ Delivery time reduced from 12 weeks to 8 weeks (33% improvement)
✓ Material waste reduced from 18% to 5% (72% reduction)
✓ Production cost savings of $2.4M annually
✓ Quality defects decreased by 89%
✓ Customer satisfaction: 4.9/5 stars


CASE STUDY 2: DEFENSE SYSTEMS CUSTOMIZATION

Client: Tier-1 Defense Contractor
Challenge: Custom component design for mission-critical system required simultaneous compliance with AS9100, MIL-SPEC standards while meeting aggressive timeline

Solution: AOA’s integrated engineering approach combining:

  • Rigorous design analysis and simulation
  • Compliance-first engineering methodology
  • Rapid prototyping and testing
  • Quality assurance verification

Results:
✓ First-time pass rate: 98% (industry standard: 85%)
✓ Project completed 3 weeks ahead of schedule
✓ All regulatory compliance requirements met
✓ Zero defects in production run
✓ Awarded repeat contract for 3 additional programs

These case studies demonstrate AOA’s proven ability to deliver results in high-complexity, regulated industries. Ready to discuss your project? Contact our team today.